Nirvana 1941 Chris Craft

All things general in here
Bob Vic
Posts: 908
Joined: 04 Mar 2009, 17:17
Location: Newlands Arm

Re: Nirvana 1941 Chris Craft

Postby Bob Vic » 05 Mar 2022, 17:22

A few updates everyone. The instruments took a month (Aust Post and USPS) but have landed with Kocian Instruments. The assessment is a mixed bag. The tacho is seized and has a lot to be done to get it working and looking good again. The oil and amp gauges are in good conditioned and will take less to bring them back to looking beautiful. They are booked to be done May/June. I've been in touch with fellow member Andy Griffiths (auto elec guru) and he's going to bring back my 6 volt engines bolt ons (distributor, starter and generator) down to Yarrawonga for the Griffith Cup. Thanks Andy. Finished the ceiling boards today - all docked to length & looking good. The big flat washers are there to hold everything in place and will be replaced with ss screws and cups under the heads. Undecided whether to epoxy them in place or rely on the screws, which is the way CC did it ex factory. I'll leave the stain and varnish on these until such time as the seat frames are done and in place, which is the next step.
Attachments
20220305_155726.jpg
20220305_155726.jpg (4.69 MiB) Viewed 4601 times
20220228_164232.jpg
20220228_164232.jpg (2.52 MiB) Viewed 4601 times

User avatar
WoodRay
Posts: 1018
Joined: 12 Feb 2014, 15:19

Re: Nirvana 1941 Chris Craft

Postby WoodRay » 05 Mar 2022, 22:04

Great work Bob. Good to see you're getting back into it. I should take a leaf from your book.

rayza1
Posts: 1577
Joined: 12 Jul 2009, 20:24

Re: Nirvana 1941 Chris Craft

Postby rayza1 » 08 Mar 2022, 18:24

You are an artist Bob, love your work!

Bob Vic
Posts: 908
Joined: 04 Mar 2009, 17:17
Location: Newlands Arm

Re: Nirvana 1941 Chris Craft

Postby Bob Vic » 09 Mar 2022, 18:52

A bit more achieved over the past few days. It never ceases to amaze me how little there is to show sometimes for the hours and days of work. This pic shows the ceiling boards fitted, toe rail fitted both port & starboard and the seat base wedges cut but not yet fitted. The general plan is to cut and fit the cockpit framing with screws (which was how the boat was built in 1941) but once all the interior framing work is done I'll remove it all, stain & varnish the ceiling boards then reinstall all the timber frame work with screws and epoxy.
Attachments
20220309_181358.jpg
20220309_181358.jpg (2.56 MiB) Viewed 4536 times
20220309_181431.jpg
20220309_181431.jpg (2.62 MiB) Viewed 4536 times

User avatar
WoodRay
Posts: 1018
Joined: 12 Feb 2014, 15:19

Re: Nirvana 1941 Chris Craft

Postby WoodRay » 17 Mar 2022, 18:25

Plugging away there Bob. Quality doesn't come quickly, and you're doing a great job.

Bob Vic
Posts: 908
Joined: 04 Mar 2009, 17:17
Location: Newlands Arm

Re: Nirvana 1941 Chris Craft

Postby Bob Vic » 18 Jul 2022, 19:55

After some months of time away from the tools, I'm back into it again. Over the past couple of days I've been working on the seats. New alloy fuel tank is underway, restored gauges are due back in a month and engine electrics are with Andy. I'm thinking that the engine & ancillary gear need to go in before the deck goes on.
Attachments
20220717_164914.jpg
20220717_164914.jpg (2.62 MiB) Viewed 3992 times
20220717_164933.jpg
20220717_164933.jpg (2.63 MiB) Viewed 3992 times
20220717_164948.jpg
20220717_164948.jpg (2.6 MiB) Viewed 3992 times

User avatar
WoodRay
Posts: 1018
Joined: 12 Feb 2014, 15:19

Re: Nirvana 1941 Chris Craft

Postby WoodRay » 19 Jul 2022, 13:28

Great work Bob. I'd probably set the engine up before the deck goes on as you say. Nothing worse than having to work in a tight space especially as we age.

screwit
Posts: 1063
Joined: 09 Apr 2010, 21:29
Location: Stratford vic

Re: Nirvana 1941 Chris Craft

Postby screwit » 08 Aug 2022, 20:34

Looking good Bob

Bob Vic
Posts: 908
Joined: 04 Mar 2009, 17:17
Location: Newlands Arm

Re: Nirvana 1941 Chris Craft

Postby Bob Vic » 08 Aug 2022, 20:36

I've been back on to Nirvana for a few weeks now, following our winter trip to the Flinders Ranges and Cober Pedy. Timber work on ther seating area of the cockpit is almost done. All seat frames complete, Cypress pine floor boards cut and fitted, beech seat bases cut and fitted, beech kickboard all done too. The square holes in the two seat bases are for storage bins under the upholstery to hold car keys, wallets, sunnies etc. I'll make up the bin and then fit hinged lids. Steering column is in as a trial fit to check kickboard height and clearance. Steering rod and gearshift rod (both 1/2" gal water pipe!) run under the seats, but I can feed them up through the exhaust hole later on, saving the grief of having to lay them into the bottom of the boat under the seats, before I glue and screw everything into place.
Attachments
20220808_180750.jpg
20220808_180750.jpg (2.9 MiB) Viewed 3861 times
20220807_160851.jpg
20220807_160851.jpg (2.34 MiB) Viewed 3861 times

User avatar
WoodRay
Posts: 1018
Joined: 12 Feb 2014, 15:19

Re: Nirvana 1941 Chris Craft

Postby WoodRay » 08 Aug 2022, 21:28

That's all a bit exciting Bob. Looking the goods with that work. Keep it up.


Return to “Main Room”

Who is online

Users browsing this forum: No registered users and 153 guests