Completed Winter jobs
Posted: 18 Oct 2016, 17:15
Ready for some warm weather and Glenbawn Dam !
Have wanted to be able to adjust the trim without having to reach down, pull up and lock the hand trim lever. Foot override doesn't lock which will be good for crossing wakes.
The old Oregon swim deck was starting to have it's repairs repaired, so it was time to replace. Found a nice supply of stainless tube out of an old dairy, thin wall and bends included.
Windscreen project was started 3 years ago ! The screen is glass cut from a car windscreen.
Next job is to strip hull, paint and re-varnish. Next year!
Have wanted to be able to adjust the trim without having to reach down, pull up and lock the hand trim lever. Foot override doesn't lock which will be good for crossing wakes.
The old Oregon swim deck was starting to have it's repairs repaired, so it was time to replace. Found a nice supply of stainless tube out of an old dairy, thin wall and bends included.
Windscreen project was started 3 years ago ! The screen is glass cut from a car windscreen.
Next job is to strip hull, paint and re-varnish. Next year!